Practical Pavement Management for Local Agencies

By | Uncategorized | No Comments

Have you downloaded the Purdue e-Pub from Blair Barnhardt?

Screen Shot 2016-07-06 at 5.43.36 PM

Session Title

Practical Pavement Management for Local Agencies

Track Title

Pavement Management

Event Description/Abstract

During this presentation, attendees will learn
about best practices for pavement managers.
Whether you are setting up a pavement
management system (PMS) for the first time
and from ground zero, or you are a seasoned
pavement manager working with an existing
system, this presentation will provide you with
current, useful information that you will be able
to apply the moment you step back into your
office.

And Do Not Forget the FREE BOOK!

320x50a

Save

I-88 Rubberized Asphalt Project

By | airport pavement, ASCE, asphalt, BARM, Barnhardt, department of transportation, DOT, engineer, engineering, Georgia DOT, ha5, highways, homeowners, infrastructure, micropaver, overlay, pavement, pavement engineer, pavement management, Pavement management asphalt recycling, pavement management plan, pavement preservationist, pavement study, pavement survey, recycle, recycling, resurfacing, road, Road resurfacing, streetsaver, transportation | No Comments

Last year, Asphalt Plus conducted a trial project of dry process crumb rubber modified asphalt on Interstate 88 near Rochelle, Illinois. The project included the laboratory evaluation of two asphalt mix design and placement of two lane-miles of pavement on I-88.

The first mix was:

  • Friction SMA (ILDOT)
  • 34% ABR (5% RAS and 8 lbs of rubber mix per ton)
  • No RAS content

Tests suggest comparable Hamburg and DCT performance between dry process CRM asphalt and PMA.Screen Shot 2016-05-19 at 5.49.06 PM

  • 2 vs. 2.5 mm rut respectively
  • 602 vs. 566 DCT respectively

The second mix was:

  • 12.5 N75 Fine Surface Graded Mix (WIDOT)

Lab testing of the WIDOT mix with and without engineered dry process rubber showed the rubber additions significantly improved mix performance.

Presence of rubber improved:

  • Hamburg rutting from 8.2 mm at 10,000 passes to 3.4 mm at 20,000 passes
  • Increased DCT results from 358 to 482

Modifying The PlantScreen Shot 2016-05-19 at 5.49.15 PM

The Curran DeKalb plant was modified for dry process asphalt production in a matter of a few hours.

Using a loss-in-weight feeder system:

  • Engineered crumb rubber was injected into production with a high degree of accuracy
  • Plant production of CRM asphalt at full production rates occurred without interruption
  • Two mix designs were produced in sequence with minimal waste

The asphalt mixes were trucked 40 miles on a cool day (55 F at start), and placement temperatures ranged from 235 to 280 F off the trucks.

The Finished Product:

  • Finished without any tearing
  • Vibratory rollers produced specified compaction without special effort and without stopping plant operations

Performance evaluations will continue in the field following a winter of service. The existing record of technology field performance in colder climates strongly suggests that the use of dry process engineered rubberized asphalt mix designs will be permitted as a competitive alternative to other forms of modified asphalt. The cost advantage suggests this process will benefit both producers and road owners.

 

View full case study

From http://asphaltplus.com/rubberized-asphalt-trial-project/

And get the FREE BOOK!

320x50a

Pavement Management | News to Use

By | airport pavement, apwa, ASCE, asphalt, Barnhardt, berkeley, California DOT, department of transportation, DOT, engineer, engineering, Georgia DOT, ha5, highways, hir, hot in place, infrastructure, ipma, micropaver, microsurfacing, pavement, pavement engineer, pavement management, Pavement management asphalt recycling, pavement management plan, pavement preservationist, pavement study, pavement survey, potholes, professional development hours, recycling, road, Road resurfacing, streets, streetsaver, transportation | No Comments

City unveils Measure A spending plan

Screen Shot 2016-05-03 at 8.28.53 PMThe county of Santa Barbara Transportation Sales Tax, or Measure A, was passed by voters and is used to keep roads in the county well-maintained for vehicles and pedestrians. On Monday, the city of Santa Maria unveiled how it planned to spend its share of funds generated by Measure A for the next five years.

Since 2008, Santa Barbara County has imposed a one-half of a cent sales tax on purchases made in the county to fund transportation projects. Measure A was a continuation of an earlier program called Measure D, which was approved by voters in 1989.

The county collects the funds and, then, distributes them to all the incorporated municipalities to help fund their street maintenance programs.

“The distribution is based on population,” said Rodger Olds, Santa Maria’s senior civil engineer. “Santa Maria gets the lion’s share of the money.”

The total allocation for fiscal year 2016-17 is $5.1 million. The total allotment for fiscal year 2016-21 will be $26.2 million.

“Of that, we are required to spend 15 percent on alternative transportation expenditures,” Olds said.

The alternative expenditure projects include sidewalk and bicycle lane improvements.

Monday’s presentation only laid out the financial breakdown for the next five years; it did not list specific projects.

The city of Santa Maria relies on a computer program to create its paving plan.

“We have a pavement management program called Street Saver. It identifies what roadways need to be maintained and upgraded,” Olds said.

The computer application uses data it receives from city staff members.

“Street crews survey the roadways and give everyone a score. That gets entered into the program,” Olds explained.

City streets are also on a resurfacing schedule.

“We have been on a chip seal program for years. Every residential street is on a 10-year schedule. Most of our major roadways are on a seven-year schedule,” Olds said.

Chip seal is the process where a multiple layers of a binder is laid on the road surface, then covered with small stones that are rolled and embedded in the binder.

“It is a good preservative for roadways,” the city engineer added.

A few years ago, the city of Santa Maria used Measure A funds to replace every street light in the city with brighter LED lights.

“Some of the area lights in parking lots haven’t been fitted yet, but we are working on it. We are almost done,” Olds said.

The city of Santa Maria’s Public Works Department also recently embarked on a project to address Americans with Disabilities Act (ADA) ramps on sidewalks at intersections in the city.

“We are close to getting intersections that don’t have any ramps done,” Olds said.

The Five Year Measure A Program of Projects will next go before the Santa Maria City Council during its May 17 meeting.

From:  https://santamariatimes.com/

Get the FREE “Book on Better Roads” at:

320x50a

New Pavement Management Software and Machinery, OH MY!

By | Uncategorized | No Comments

Have you ever seen the Equipment Show at Dixie Road School?

WOW! 

And, we are “in the front ROW” (good ‘ol Bob Uecker).  You can be too.

In this webinar, we will view the latest and greatest in FIELD RATING!

From StreetSaver™ software to core-drilling on the COOLEST Prowler EVER…Man, I just can’t get enough of this stuff!.

Tomorrow is the day!  Sign up here:  REGISTRATION

Don’t miss this informative event!


Date and Time

Wed, Apr 20, 2016 3:00 PM – 5:00 PM EDT


If you haven’t got a copy of the book yet, claim yours for free right here…..

Utah Roadie, Roadie, Roadie | Pavement Management

By | @FHWA, @rockstar, Alabama, apwa, arizona, ASCE, asphalt, BARM, Barnhardt, California DOT, Cobb County, Colorado, department of transportation, DOT, education, engineer, engineering, fatigue cracking, fdr, free, Georgia DOT, ha5, ha5f, highways, hir, hot in place, infrastructure, ipma, micropaver, microsurfacing, nace, NCAT, overlays, patching, pavement, pavement engineer, pavement management, Pavement management asphalt recycling, pavement management plan, pavement preservationist, pavement study, pavement survey, potholes, preservation, resurfacing, road, streets, streetsaver, Texas, transportation, utah, webinar | No Comments

Well, it’s official!  Blair got the PURPLE HARLEY.  Now he and Jackie are tearing up Route 66.

Jack
Blair and I are hosting a special free webinar next Wednesday at 2pm.

He is presenting in Utah and wants to share the excitement with you in a LIVE webinar!

Click Here To Register
 
Webinar ID: 145-062-755

                                                                      For information on the conference…

Screen Shot 2016-04-14 at 6.58.34 PM

We may have some special guests on and some Alums that will answer questions you may have.  (this is in addition to our PDH Power Hour Monthly Free Webinar Series).

At the very least, grab a copy of the Book on Better Roads for FREE!

Get Your FREE Copy - 2

Date and Time

Wed, Apr 20, 2016 3:00 PM – 5:00 PM EDT

So Keep this email handy!

It’s that easy!  Please email lori@ipmaacademy.com if you
have a “HOT TOPIC” that you would like to discuss.

Send in your questions by Monday, April 18th at 5PM.

Lori Miles

lori@ipmaacademy.com 😃 404-594-8819
The International Pavement Management Association (IPMA)

The Three-legged Stool™ System of Pavement Management

By | Uncategorized | No Comments

3ls_socialmedia_1200x628

If you’re going to set up a three-legged stool™ system of pavement management and
succeed with it, it’s basically three steps.

You’ve got:
• Pavement management as #1,
• Pavement preservation as #2,
• In-place recycling as #3.

When you marry all three of these together,you get the three-legged stool™ system of pavement management.

1. Pavement Management
First of all, many cities and counties typically have no idea how many miles of paved road they actually have. We see this firsthand.  I walk this walk and talk the talk every single day. When I’m not making new curriculum for IPMA Academy or for one of our books or one of our audio or DVD sets, my consulting firm is out there on
the ground doing pavement distress evaluation day in, day out, all across this great country.
Moreover, many cities and counties have no idea of the condition of these roadways. For $0.02 per square yard, they can have a pavement distress evaluation performed, whether they get their own folks to do it in their house or hire an expert consulting firm.
Now if you do hire an expert consulting firm, I highly recommend that the consultants are selected following the guidelines laid out in the APWA Red Book, the qualifications-based selection guide.  So go ahead and get that from Apwa.net if you don’t already have it.  The pavement distress evaluation will help to identify the pavement type, whether it’s chipseal or micro-surfacing, hot-mix asphalt pavement or otherwise, along with the pavement condition index, the all important PCI. Now typically, the PCI has zero as undriveable at the bottom end and 100 as brand new at the top end per ASTM 6433. Now other systems may be 1 to 10 or 0 to 60; we’re
talking in the book predominantly and throughout IPMA Academy about ASTM 6433 or 0 to 100 scale with 100 being brand new.  Once the PCI is in the computer software, three different types of budgets can be run.
These three scenarios are as follows:
1.  A needs-based budget in the scenario the algorithms and the software will compute precisely how much money your city, your county needs each year to get your pavement network at optimum level. That’s an average network level of PCI of maybe 84 to 86. It never gets to 100; 84/86 is optimal. That is like winning the lottery, is what I usually say when we print that binder off and give it to our clients.
We say, “Unless you win the lottery, you’re never going to have enough money to go around to do everything that the software wants you to do.”
2.  Next, we have target-driven scenario, and the target-driven scenario is where you go back to city council or the county commission meeting, and you say, “We’re at a network level of PCI equals 57 that we’d like to get to a 70.” So now knowing that you aspire to get to a PCI of 70, the software will actually go out and tell you how much money it will take to do that and how long it will take to do it. So again, that is a target-driven scenario.
A 30,000-foot Overview of Pavement Management:
3.  Now the third is generally the budget scenario that we set up. It is where you come to us or you go to your pavement manager, and you say, “I have $5 million a year to spend, and by the way, there is a detailed little analysis in your book that will tell you how much you should be spending each year on your roads. So make sure you refer to that from time to time.”  So, in the budget case scenario, you tell the program you’ve $5 million to spend; it will go out there and tell you if you’re under
funded and if your network PCI is going to drop or stay the same or go out. Based on that amount per year, you can tweak it so you can spend various amounts per year. If you have a sudden influx of money, you can run another budget scenario and add that.  At this point, I must stress the importance of having a qualified staff to set up your decision tree within a computerized pavement management software platform. There’s two software programs that are used most frequently for cities and counties, and those two are MicroPAVER and StreetSaver. Both programs allow the user to spend just $1,000 or $2,000, and you’re up and running, whether you do it in-house or you hire someone to do it. They’re not expensive, very robust programs, and they can be cloud-based. In the case of MicroPAVER, it can also be on your server.
But most of the industry is heading more towards a cloud-based system with automatic updates, so you never have to worry about automatic backups; you never have to worry about a thing other than putting your data in and managing it. Both programs follow ASTM 6433 and are fully capable of doing all the aforementioned
scenarios and the decision tree setup.
Now remember, a real person has to sit down and put in all the unit prices for the decision tree setup. I will reiterate, many pavement management software programs are very sophisticated and robust, and can run multiple scenarios on multiple different types of pavement and functional class codes, but they are all only being fed thin overlay, medium overlay, and thick overlay. That in itself is a recipe for disaster as there are so many tools in the preservation and rehabilitation toolbox to repair your infrastructure.
Pavement Management Primer
6
The most common question I get is, “How much does it cost me to set all this up, Blair, and pay for the program?” So again, MicroPAVER or StreetSaver is going to cost you between $1,000 to $2,000, really depending on whether you get your GIS integrated and so forth. Typically, you’re going to spend $0.2 per sq. yard to set up your pavement management network. That’s including having a consultant to come out and rate everything with boots on the ground.
It’s going to save you, with qualified expertise setup, upwards of $10 per sq. yard. Now that’s a net savings of $9.98 no matter how you slice it. It doesn’t really cost you money, therefore, to manage your pavements; it’s actually costing you money not to manage them.
There’s training available through IPMA Academy should you choose to train your team in pavement management, thanks to the partnership between Auburn University and the International Pavement Management Association. Again, IPMA Academy’s 70 hours of the most comprehensive online training available to mankind ever created, you get your Accredited Pavement Manager certification. Now with the partnership with Auburn University, you also get the Continuing Education Credits (CEUs).
We have broken out the three modules, so you can now take one module at a time. If you so choose to put all three together, you get your APM (Accredited Pavement Manager) designation. If you’d only take one module or two modules, you get a certificate for taking that module and the requisite CEUs.
So that is #1. You’ve got your pavement management system set up. Now let’s start going in and plugging in some of the stuff into the decision tree.

2. Pavement Preservation
The second part of the three-legged stool pavement management system is pavement preservation. Now there is a multitude of preservation treatments available across this country to preserve and protect our pavement structure, so that they never fall into a state where they need to be removed and rebuilt completely.  The timing of these treatments is critical, however, but the
good news is this that with the properly designed pavement management software system, your team will have the scientific proof of the proper treatments at the proper time.
Now one of the keys of the entire three-legged stool system is applying the right treatment on the right road at the right time with the right contractor and for all the right reasons, and not just because it’s an election year. An example of this might be as the PCI drops from 100 down to 77, a simple slurry, micro-surfacing or high density mineral bond treatment might be triggered for installation at that time.
This preservation type and timing is set up in the decision tree in the MicroPaver or the StreetSaver software or whatever software you’re using or you’ve selected, which we discussed earlier. Worth noting is that some of the preservation treatments also double as wearing surfaces for the in-place recycled roadways, and I’ll talk about that next.
But before we go any further, I have to reiterate the importance of what preservation is in the eyes of federal highways (FHWA) and the ADA (American Disabilities Act).
What is preservation, and what is an alteration?  You see, the most recent clarifications that have been made by the U.S. Department of Justice concerns the difference between doing a job with a slurry seal
Or micro-surfacing, which could mean you spend $300,000 or $900,000. The reason for that is not just that micro costs a bit more than the slurry, but, more significantly,
choosing micro forces the hand of the city or the county official to also upgrade all of the ADA ramps and sidewalks among other ADA related improvements.
Wondering how significant this is? Well, I do Google Alerts on all of the stuff we talk about in The Book On Better Roads, and just about every week I read about
some city or county that just had their paving project double in cost because of this very subject we just discussed.  One county engineer told me that one of her bucket truck drivers accidentally left the boom up on his truck at an intersection and slightly bent one of the crossbars in the signalized intersection. It cost her county half a million bucks in ADA upgrades to meet the construction compliance laws set up by the Department of Justice.

Now following is a list of some preservation products you may put into play with your city or county. Most of all the products have been used for a decade or more, some for several decades. Again, this is not meant to be an all encompassing list. A little disclaimer here: this is not meant to be an endorsement of any type of product, service, software or otherwise. We don’t roll that way here.
From the top of the curve down, we’ve got, remember, this being 100 and down to 0, and these would all fall up in the upper range of the curve, hence “top of the curve.”
We’ve got rejuvenating agents like the PASS products from Western Emulsions: rejuvenating fog seals, rejuvenating scrub seals. Then we’ve got chip seals: single, double and triple chip seals; tar and chip you may call them, other names along the way.  I’ve got to point this out: Chip seals are not seal coats. Now some state DOTs refer to chip sealing as a seal coat, but a chip seal is a chip seal. A chip seal is a surface treatment; a chip seal is not a seal coat.
Then we’ve got the high density mineral bonds (HA5). We’ve
Got slurry seals; we’ve got micro-surfacing which at one time was referred to as Polymer Modified Slurry (PMs). We’ve got ultra-thin bonded wearing courses. Thin overlays, now we’re talking about the hot-mix family here, and thin overlays with RAS (Recycled Asphalt Shingles) and RAP (Recycled Asphalt Product).  Mr. Gerry Huber talked about this. We were at Purdue together a couple years back, and he had a great discussion about RAS/RAP mixtures with upwards of 57% recycled product. I think there was like 18% Recycled Asphalt Shingles and 39% Recycled Asphalt Product. Also, I want to point out that Dr. Mike Heitzman from NCAT
also did a really good IPMA Academy live session for us just a while back on hot-mix asphalt thin overlays in pavement management.  Again, this list above is not meant to be all inclusive. If I missed something during the recording of the session, know that there are maybe a few others out there that you are considering or your agency already currently uses. So here is where the biggest bang for your buck comes for your city or county and the third leg in the three-legged stool system of pavement management:  in-place recycling.

Since the majority of our four million miles of paved roads in the USA are hot-mix asphalt pavements, we focus on the three main disciplines for hot-mix asphalt pavements, namely Hot In-place Recycling (HIR), Cold In-place Recycling (CIR), and Full-Depth Reclamation (FDR).

However, on the concrete pavement side of the rehabilitation and preservation fence, there are plenty of requisite treatments for PCC as well. One of those we discuss quite often for rehabilitation of PCC is rubblization.
3. In-Place Recycling Treatments
Following are the in-place asphalt recycling disciplines and the respective sub-disciplines.  We’ve got Hot In-place Recycling with the sub-disciplines being:
surface recycling; remixing and repaving. And we’ve got the hybrid combo called Re-HEAT.  Now simply speaking, the surface recycling technique involves a series of sequential heaters that heat up the old asphalt surface in-place. The train moves down the roadway one lane at a time, heating the pavement upwards of 300 degrees, adding polymer modified rejuvenating agent, then scarifying the surface to a nominal depth between one and two inches. The rejuvenated mix is then laid out with an attached screed, just like a conventional paving screed, which is attached to the back-end of the last sequential heater. The mix is compacted with a conventional hot-mix asphalt type pavement equipment.  You could think about this process, the surface recycling, or scarification, as giving you a new leveling course, where wearing surfaces from the pavement preservation list, could be added.

Next, we have the remixing sub-discipline heats up the old in-situ asphalt pavements, similar to the former method I just discussed, but this time, having the ability to add upwards of 30% of new version hot-mix asphalt at the same time. Now imagine, if you will, using that 57% super-duper RAP/RAS combo that I mentioned
earlier in the session as your supplemental admixture for this remixing technique.
In this technique, the crew can do two to three inches in depth by doing sequential heating, milling, and mixing. This technique is used on all types of roads, including the Oklahoma turnpike which I think I just drove over a week ago in the Better Roads bus. In the case of the turnpike, they applied an ultra-thin bonded wearing
course as the top course or the final asphalt layer.

Now the third sub-discipline of Hot In-place Recycling (HIR) is the
repaving method. When we talk about this in class, I use the peanut butter and jelly sandwich analogy. So picture this: Take the old asphalt that gets heated and scarified, much like the first sub- discipline, with the jelly being into new pavement placed on the top of the peanut butter or the one inch of heated old pavement. Both
layers are laid out with a double screed and compacted as one new homogenous mixture.  The Re-HEAT process is kind of a hybrid between the remixing and the surface recycling. It heats up about two inches of the in-situ asphalt mix and scrapes it off the road bed, picks it up and puts it into an onboard batch plant. The batch plant runs right up inside the heater unit, and the asphalt mix gets polymer modified
rejuvenating oil added to it. Nothing else is being added, per se, just the recycling agent and the old asphalt mix, but it’s getting mixed inside of a barrel which results in a really nice homogenous mixture. It now comes out behind the heater in the final preheating and heating stages, and gets put down with basically the exact same paver. It’s integral; it’s attached to the machine itself. It’s as good or better than a standard paver that you would see on a conventional hot-mix asphalt job. The mix goes down through the paver and gets laid out and compacted with conventional compaction equipment. What makes the Re-Heat a bit different is that it does not require an additional wearing surface.

With Cold In-place Recycling (CIR)you can have single unit trains, dual unit trains, and multi unit trains. The contractors are still performing partial depth reclamation and rely on you as the agency to have at least four inches of pavement depth. The contractors can strip off the entire pavement section and recycle it in-place with engineered emulsion or foamed asphalt, provided there is a good structure underneath.  The CIR contractors coin this phrase “following the rock.” It’s
worth noting here that as we go through this list of in-place recycling techniques, we are also following the declining PCI ratings.
We’re following “the curve” as we go down through these treatments. While a Hot In-Place candidate pavement may have a PCI of 62, a CIR candidate may present itself as a PCI 52 and have a thicker pavement section for the contractor to deal with.
_________________________________________

That brings us to FDR (Full-Depth Reclamation) where a typical candidate selection may be a PCI 21 or less.  Now the good news is whether it’s a 21 or an 11 or a 1, it’s still going to require FDR with some sort of wearing course. So don’t struggle once the pavements get down below 30 and think you have to do everything all at once, worst first. No. In fact, you should take two or three years to budget for those types of roads and make sure you have enough money in the budget to cover those costs.

Know that, with in-place options, you can do these FDR projects for a third of the cost of conventional dig out and reconstruction.  There will never likely be a time when you’ll have to ever, ever, ever dig up your old road and haul it away to a landfill site. In fact, for those of you who have seen me do a live conference event, I’ve been known to get the entire audience to stand up and make that pledge with me.

FDR (Full-Depth Reclamation) can be done with mechanical stabilization, chemical stabilization. or bituminous stabilization.  The pavement structure — it can be of any combination of pavement, thickness, granular or dirt — as a requisite treatment will take care of most every situation you may have.  Again, experts know to go out in the field and get proper mixed designs and soil samples, so they can align the right treatment with the right road at the right time for the right reason with the right contractor. At times, soil stabilization can be used in conjunction with the FDR to take care of the very worst case scenarios. I think back to the 30 miles in Natchez Trace Parkway that we did for Federal Highways. We took a full advantage of all the treatments that we talked about today with FDR and soil stabilization.

Note, this in-place method is a fraction of the cost of conventional undercut and provides the same or better surface life, probably the biggest no-brainer of all time.
For more information on any of the above, please refer to your copy of “The Book On Better Roads”.
Wherever you go, thanks for reading the Pavement Management Primer. Hope to see you real soon.

Blair Barnhardt, signing off.

YOUR IPMA™ Tip of the Week | Larry Dobrosky City of El Mirage

By | Uncategorized | No Comments

ipma-logo-powerhour.png

For you viewing and learning pleasure is Mr. Larry Dobrosky, Deputy City Manager of El Mirage AZ. I asked Lori to send this out today to our entire list as everyone and anyone who is interested in doing more roads for less money and less carbon footprint can benefit from this candid discussion!

“News Flash”

Spend a few cents per square yard to manage your pavements, save millions, this is the biggest no brainer in all of mankind. At the very minimum, claim YOUR free copy of The #1 Amazon Best-Seller, “The Book on Better Roads”
320x50a

“Naysayers”

Now for you Naysayers, you may as well go ahead and unsubscribe right now, because I am about to produce more of these videos for you on a weekly basis, and your inbox will be overflowing with valuable information on saving your local agencies millions.
Lori (for Blair)

 

Free IPMA™ Survey Set-up Webinar March 9th, 2016

By | Uncategorized | No Comments
Blair, Jason and Lori would like to host a Webinar for our Pavement Managers! (And even Pavement Enthusiasts)
 
“Pavement Management Survey Set-UP”
INSIDER TIPS & TRICKS for a successful start!

 
When:  March 9th, 2016
 
Time:  2PM EST
 
 
Webinar ID: 110-481-587
 
So Keep this email handy!
 
It’s that easy!  Please email lori@ipmaacademy.com if you
 
have a “HOT TOPIC” that you would like to discuss. 
 
Send in your questions by Tuesday, March 15th at 5PM.

 

 


Blair Barnhardt, APM
The International Pavement Management Association

 

Author of the Amazon #1 Best Seller,
‘The Book on Better Roads’

Pavement Management Primer Part 1

By | Uncategorized | No Comments

Hey, everyone. This is Blair Barnhardt, Founder and Executive Director of the International Pavement Management Association, and author of the book On Better Roads: Saving Your Crumbling Roadways With Practical Pavement Management with today’s session which is entitled Pavement Management Primer.

My intent is, and always has been, to help everyone understand the importance of practical pavement management, particularly in these trying economic times when pavement managers are required to do more with less money. So in today’s session, it’s meant to be a 30,000-foot overview of practical pavement management with the three-legged stool system.

First and foremost, let’s go over some things we all need to know whether we’re working with a city or a county, whether we’re a rate payer, whether we’re just some concerned citizen, some media person; maybe you’ve got access to a TV channel or something, and you want to spread this news. Just know that today’s 30,000-foot overview is a simple approach with some topics here, some things we all need to think about regarding the state of our current roadways.

For example, our MAP-21 Transportation Bill specifically calls out recycle preservation and sustainability, and yet, some states are simply ignoring this bill all together, and they continue to do things like it’s 1956. What business would still be in business today if they were still doing things like it was 1956?

Next, our Highway Trust Fund is pretty much out of money, and the prediction is that we will be out of money in October of this year. Even if it was funded, if we continue to do things the same old way, our country will never catch up with the deficit backlog of bad roads that we’ve created.

According to Smart Growth America, our country is spending 57% of its Gross Domestic Product (GDP) on a mere 1.3% of our roadway system. I’ve driven 87,000 miles over last year and a half in the RV in this country on roads that are somewhat impossible, interstates impossible, only to look in my rearview mirror and see multimillion dollar flyovers, interchanges being built seemingly for no apparent reason in the middle of nowhere.

Our fuel tax has not been changed for several decades, and people are putting more and more miles on their vehicles with these fuel-efficient and alternate fuel cars. Most local agencies’ tax revenue is at an all time low due to the downturn in the economy. Many city and county politicians perceived that paving dirt roads is a progressive momentum and an effort to keep their rate payers happy. But the harsh reality is that in these trying times, some cities and counties have simply been forced to turn their paved roads back to dirt.

In fact, just this past week, I set up Google Alerts on all things, the three-legged stool and the book On Better Roads, NCHRP (The National Cooperative Highway Research Program) is looking for consultants to help write an upcoming project that will guide local agencies, just like you, as to the correct timing of when they should grind up their asphalt roads. NCHRP is looking for consultants that will work with them on a project that will help agencies, like you, to know when the correct time is to grind up their asphalt roads and turn them back to dirt.

I’ll just let you think about that for a second. They know that there is a plethora of cities and counties coming down the road here that will have no choice but to grind up their paved roads and turn them back to dirt. When our commissioners are thinking that their road managers should be out there paving the roads, isn’t that an oxymoron itself?

Asphalt is the #1 recycled product in America, in fact, over 100 million tons a year recycled and typically put back in the asphalt plant each year. However, we currently only recycle in place a small percentage, perhaps 3% or 4% in this country, even though this process has proven themselves to be inexpensive and eco efficient for decades. Some states are currently recycling roads that they initially recycled 22 years ago. This works, folks, and you’ll read all about that in the book On Better Roads.

imagesCAIOC9J0

Furthermore, ADA (American Disabilities Act) clarifications are doubling the cost of urban type projects, and I’ll talk a little bit about that later on in the same session. Only about 10% of the traveling public understands what pavement preservation is even though everyone knows the importance of taking care of their homes and cars and preserving those assets. Our roadway system in America is our most valuable asset with over four million miles of paved roads.

So as told a long time ago, never to go to your boss and present a problem without a potential solution, as you might have guessed, there is a simple solution, and I have the solution, and it’s the three-legged stool system of pavement management. I will discuss some of the key elements in terms to the system.

For those of you who are not pavement managers – the non-pavement manager type city officials, rater payers, everyday normal citizens like you guys – these key elements in terms are going to be discussed in great detail in the book On Better Roads and throughout the IPMA Academy along with our sponsor, our academic partner Auburn University.

So again, 30,000-foot overview, I wanted this session to be one that you could share amongst yourselves. At one point, I think Everett and I will go ahead and put this onto a physical CD that you can pass around the office. But for now, enjoy the mp3; let’s get into this right now.

If you’re going to set up a three-legged stool system of pavement management and succeed with it, it’s basically three steps. You’ve got pavement management as #1, pavement preservation as #2, in-place recycling is #3. When you marry all three of these together, you get the three-legged stool system of pavement management.

So first of all, cities and counties typically have no idea how many miles of paved road they actually have. If we see this firsthand, understand you people listening that I walk this walk and talk the talk every single day. When I’m not making new curriculum for IPMA Academy or for one of our books or one of our audio or DVD sets, my consulting firm is out there on the ground doing pavement distress evaluation day in, day out all across this great country.

imagesCACESHYQ

Moreover, they have no idea of the condition of these roadways. For $0.2 per sq. yard, they can have a pavement distress evaluation performed, whether you get your own folks to do it in your house or with an expert consulting firm. Now if you do hire an expert consulting firm, I highly recommend that the consultants are selected following the guidelines laid out in the APWA Red Book, the qualifications-based selection guide. So go ahead and get that from Apwa.net if you don’t already have it.

The pavement distress evaluation will help to identify the pavement type, whether it’s chipseal or micro-surfacing, hot-mix asphalt pavement or otherwise, along with the pavement condition index, the all important PCI. Now typically, the PCI has zero as undriveable at the bottom end and 100 as brand new at the top end per ASTM 6433. Now other systems may be 1 to 10 or 0 to 60; we’re talking in the book predominantly and throughout IPMA Academy about ASTM 6433 or 0 to 100 scale with 100 being brand new.

Once the PCI is in the computer software, three different types of budgets can be run. These three scenarios are as follows:

  1. A needs-based budget in the scenario the algorithms and the software will compute precisely how much money your city, your county needs each year to get your pavement network at optimum level. That’s an average network level of PCI of maybe 84 to 86. It never gets to B-100; 84/86 is optimal. That is like winning the lottery, is what I usually say when we print that binder off and give it to our clients. We say, “Unless you win the lottery, you’re never going to have enough money to go around to do everything that the software wants you to do.”
  2. Next, we have target-driven scenario, and the target-driven scenario is where you go back to city council or the county commission meeting, and you say, “We’re at a network level of PCI equals 57 that we’d like to get to a 70.” So now knowing that you aspire to get to a PCI of 70, the software will actually go out and tell you how much money it will take to do that and how long it will take to do it. So again, that is a target-driven scenario.
  3. Now the third is generally the budget scenario that we set up is where you come to us or you go to your pavement manager, and you say, “I have $5 million a year to spend, and by the way, there is a detailed little analysis in your book that will tell you how much you should be spending each year on your roads. So make sure you refer to that from time to time.”

So in the budget case scenario, you tell us we’ve got $5 million to spend; it will go out there and tell you if we’re underfunded, if the PCI is going to drop or stay the same or go out. Based on that amount per year, you can tweak it so you can spend various amounts per year. If you have a sudden influx of money, you can run another budget scenario and add that.

So at this point, I must stress the importance of having a qualified staff to set up your decision tree within a computerized pavement management software platform. There’s two software programs that are used most frequently for cities and counties, and those two are MicroPAVER and StreetSaver. Both programs allow the user to spend just $1,000 or $2,000, and you’re up and running, whether you do it in house or you hire someone to do it. It’s not expensive, very robust programs, and they can be cloud based. In the case of MicroPAVER, it can also be on your server.

But most of the industry is heading more towards a cloud-based system with automatic update, so you never have to worry about automatic backups; you never have to worry about a thing other than putting your data in and managing it. Both programs follow ASTM 6433 and are fully capable of doing all the aforementioned scenarios and the decision tree setup.

5. CIR crew

Now remember, a real person has to sit down and put in all the unit prices for the decision tree setup. I will reiterate, many pavement management software programs are very sophisticated and robust, and can run multiple scenarios on multiple different types of pavement and functional class codes, but they are all only being fed thin overlay, medium overlay, and thick overlay. That in itself is a recipe for disaster as there are so many tools in the preservation and rehabilitation toolbox to repair your infrastructure.

The most common question I get is, “How much does it cost me to set all this up, Blair, and pay for the program?” So again, MicroPAVER or StreetSaver is going to cost you between $1,000 to $2,000, really depending on whether you get your GIS integrated and so forth. Typically, you’re going to spend $0.2 per sq. yard to set up your pavement management network. That’s including having a consultant to come out and rate everything with booths on the ground.

It’s going to save you, with qualified expertise setup, upwards of $10 per sq. yard. Now that’s a net savings of $9.98 no matter how you slice it. It doesn’t really cost you money, therefore, to manage your pavements; it’s actually costing you money not to manage them.

There’s training available through IPMA Academy should you choose to train your team in pavement management, thanks to the partnership between Auburn University and the International Pavement Management Association. Again, IPMA Academy’s 70 hours of the most comprehensive online training available to mankind ever created, you get your Accredited Pavement Manager certification. Now with the partnership with Auburn University, you also get the CEU credits.

We have broken out the three modules, so you can now take one module at a time. If you so choose to put all three together, you get your APM (Accredited Pavement Manager) designation. If you’d only take one module or two modules, you get a certificate for taking that module and the requisite CEUs.

So that is #1, you’ve got your pavement management system set up. Now let’s start going in and plugging in some of the stuff into the decision tree. Second part of the three-legged stool pavement management system is pavement preservation. Now there is a multitude of preservation treatments available across this country to preserve and protect our pavement structure, so that they never fall into a state where they need to be removed and rebuilt completely.

The timing of these treatments is critical, however, but the good news is this that with the properly designed pavement management software system, your team will have the scientific proof of the proper treatments at the proper time.

Now one of the keys of the entire three-legged stool system is applying the right treatment on the right road at the right time with the right contractor and for all the right reasons, and not just because it’s an election year. An example of this might be as the PCI drops from 100 down to 77, a simple slurry, micro-surfacing or high density mineral bond treatment might be triggered for installation at that time.

This preservation type and timing is set up in the decision tree in the paver or the StreetSaver software or whatever software you’re using or you’ve selected, which we previously discussed earlier. Worth noting is that some of the preservation treatments also double as wearing surfaces for the in-place recycled roadways, and I’ll talk about that next. But before we go any further, I have to reiterate the importance of understanding in the eyes of federal highways (FHWA) and ADA (American Disabilities Act).

What is preservation, and what is an alteration?

You see what the most recent clarifications that have been made by the U.S. Department of Justice, the difference between doing a job with a slurry seal and a micro-surfacing could be whether you spend $300,000 or $900,000. The reason for that is ______ 15:58 micro costs a bit more than the slurry. But more importantly, the micro forces the hand to the city or the county official now to upgrade all of the ADA ramps and sidewalks among other things.

Wondering how significant this is?

Well, I do Google Alerts on all of the stuff we talk about in the book On Better Roads, and not a week goes by when I don’t read about some city or county that just had their project double in cost because of this very subject we just discussed.

One county engineer told me that one of her bucket truck drivers accidentally left the boom up on his truck at an intersection and slightly bent one of the crossbars in the signalized intersection. It cost the county half a million bucks in ADA upgrades to fall into compliance with the Department of Justice.

Now following is a list of some preservation products you may put into play with your city or county. Most of all the products have been used for a decade or more, some for several decades. Again, this is not meant to be an all encompassing list. A little disclaimer here: this is not meant to be an endorsement of any type of product, service, software or otherwise. We don’t roll that way here.

From the top of the curve down, we’ve got, remember, this being 100 and down to 0, and these would all fall up in the upper range of the curve, hence top of the curve. We’ve got rejuvenating agents like the PASS products from Western Emulsions – rejuvenating fog seals, rejuvenating scrub seals. Then we’ve got chip seals – single, double and triple chip seals, tar and chip you may call them, other names along the way.

Again, I’ve got to point this out. Chip seals are not seal coats. Now some state DOTs refer to chip sealing as a seal coat, but a chip seal is a chip seal. A chip seal is a surface treatment; a chip seal is not a seal coat.

The Barnhardt Group, LLC.

Atlantic Division
1017 Ector Drive Nw
Kennesaw, GA 30152
Phone 404-316-9792
Fax 678-398-9014

Pacific Division
1001 Bayhill Drive, Ste. 200
San Bruno, CA 90466
Phone 650-922-0469
Fax 650-616-4001

Blair Barnhardt, CEO

blair@thebarnhardtgroup.com

Flash Sale | 15 Hours on Pavement Management Training

By | @FHWA, @rockstar, a, acoustic, airport pavement, Alabama, apwa, Arapahoe, arizona, ASCE, asphalt, AZ, BARM, Barnhardt, berkeley, California DOT, cold in place, cracking, department of transportation, DOT, education, engineer, engineering, fatigue cracking, fdr, Georgia DOT, ha5, ha5f, highways, hir, hot in place, infrastructure, John Lee Dumas, Kent, micropaver, microsurfacing, milling, nace, NCAT, overlay, overlays, patching, pavement, pavement engineer, pavement management, Pavement management asphalt recycling, pavement management plan, pavement preservationist, pavement study, pavement survey, potholes, preservation, recycling, resurfacing, Road resurfacing, roads, streets, streetsaver, stringbenders, subgrade, transportation, utah, Washington | No Comments

Blair is going to kill me!

The Unreleased Black Album was selling SO fast!!  I panicked and ordered the 8 DVD Special instead of the Single DVD (yeah, and a whopping 200 pcs).

As you can guess, this pushed “BOSS MAN” over the edge due to the HUGE inventory cost differential. 🙁

This one is normally $400 BUCKS!

Just give me the cost back and he might keep me around.

CLICK HERE to have it delivered for $90.91!!! (I am paying your shipping in the US, for sure!)

THEY GOT TO GO!  I love my job!

(There is a bit of urgency here)

Here’s what’s inside:  Over 15 HOURS across 4 different states in countless INSIDER TIPS.  Since agency folks are not allowed to travel, we have produced amazing training sessions to view in the comfort of your office or home.

Guest speakers include the following:greatesthits-dvd-3d
Basem Muallem, PE
Brian Frix, EIT, APM
Dr. Mike Heitzman, PE
James Emerson, APM
Blair Barnhardt, APM
Kevin Donnelly, APM
Dr. Gary Hicks, PE
Miguel Valentin, PE, APM
Dave Fokken
Pat Faster
Rusty Smallwood
Mark Beatty

PS. The Greatest Box Set includes PDH Power Hour 01 as a special bonus.
As this deal is only good through my termination dat, take advantage now by ordering today!”

BUY ME

Howard Shieh, PE, APM emphatically states, “Blair’s training episodes and book really inspire me. His experience and enthusiasm with pavement management is remarkable!”

PLEASE BUY ME

I hope you take advantage of this great offer!

Best,

Lori
(404) 953-0131
320x50a